Abstract
This Meta EIP lists the EIPs formally Proposed, Considered, Declined for & Scheduled for Inclusion in the Glamsterdam network upgrade.
Specification
Definitions for Scheduled for Inclusion, Considered for Inclusion, Declined for Inclusion and Proposed for Inclusion can be found in EIP-7723.
EIPs Scheduled for Inclusion
- EIP-2780: Resource-Based Intrinsic Transaction Gas
- EIP-7688: Forward Compatible Consensus Data Structures
- EIP-7708: ETH Transfers Emit a Log
- EIP-7732: Enshrined Proposer-Builder Separation
- EIP-7778: Block Gas Accounting without Refunds
- EIP-7843: SLOTNUM Opcode
- EIP-7928: Block-Level Access Lists
- EIP-7954: Increase Maximum Contract Size
- EIP-7976: Increase Calldata Floor Cost
- EIP-7981: Increase Access List Cost
- EIP-7997: Deterministic Factory Contract
- EIP-8024: Backward Compatible SWAPN, DUPN, EXCHANGE
- EIP-8037: State Creation Gas Cost Increase
- EIP-8038: State-Access Gas Cost Update
- EIP-8045: Exclude Slashed Validators from Proposing
- EIP-8061: Increase Exit and Consolidation Churn
- EIP-8246: Remove SELFDESTRUCT Burn
- EIP-8282: Builder Execution Requests
Other EIPs
Networking EIPs
- EIP-7975: eth/70 - Partial Block Receipt Lists
- EIP-8070: eth/72 - Sparse Blobpool
- EIP-8136: Cell-Level Deltas for Data Column Broadcast
- EIP-8159: eth/71 - Block Access List Exchange
- EIP-8189: snap/2 - BAL-Based State Healing
Informational EIP
Mascot
Polar bear 🐻❄️ is the mascot for the Glamsterdam network upgrade, as per the EIP-8066 process.
Activation
| Network Name | Activation Epoch | Activation Timestamp |
|---|---|---|
| Sepolia | 353024 | 1791294816 (2026-10-06 13:53:36 UTC) |
| Hoodi | 132352 | 1793036568 (2026-10-26 17:42:48 UTC) |
| Mainnet |
Note: rows in the table above will be filled as activation times are decided by client teams.
Rationale
This Meta EIP provides a global view of all changes included in the Glamsterdam network upgrade, as well as links to full specification.
Security Considerations
None.
Copyright
Copyright and related rights waived via CC0.
